Customization: | Available |
---|---|
After-sales Service: | Lifetime After-Sales Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Folder Gluer Machine (3200-A)
Carton delivery
+ carton folder +
Collect cartons
Brief introduction :
Jiajie Automatic Folder Gluer Machine is mainly composed of three parts, Carton delivery
,carton folder and
Collect cartons.
suitable for 3 layers, 5 layers of single cardboard box stitching and bonding, higher precision, faster speed, long service life, man-machine operation interface is more concise and convenient.
Model | JDXHX-3200-A |
Max Sheet Size | 3200*1600mm |
Mini Sheet Size | 1160*400mm |
Installation Area | 25000*5000mm |
Weight | ≈11.7T |
Power | ≤42KW |
Air Preasure | 0.6-0.8MPa |
Power | (3P 5W)380V 50HZ |
1.Machine standard:
Suitable for stitching and gluing three-layer and five-layer single sheet cartons.
2.Purchasing Reason:
(1).The carton has a fast forming speed.
(2). The cardboard are fed accurately by air suction.
(3). Twice indentations and make the folding more accurate.
(4). The large and small openings are well controlled to reduce waste products.
(5). Adopt 90 ° sorting to improve the high forming accuracy of large cardboard.
(6). Avoid scratches on the color carton.
E | A=C | B=D | F | G | |
Max | 3200 | 1100 | 720 | 1600 | 40 |
Mini | 1160 | 340 | 240 | 400 | 35 |
1. Plastic film package normally,The key parts are wrapped in cartons.
2.If special packaging, pls tell us in advance.
Tangshan Jiajie Packaging Machinery Manufacturing Co., Ltd. is a professional engaged in printing and packaging machinery research and development, manufacturing, sales in one of the enterprises, located in Beijing, Tianjin, Tang city economic circle center of the core area - Yutian County, Hebei province, Yutian is the north's largest printing machinery manufacturing base, in China's printing machine manufacturing industry occupies a pivotal position, there is "China's printing machine town" reputation.
1.Q:What are the wear parts?
A:belt ,rubber wheel .....
2.Q:How long does it take to install ?
A:About three days
3.Q:How long does it take to debug ?
A:About three days
4.Q:What's the delivery time?
A:Normally 30 days.